国产在线无码三级片-操学生妹无套内射吃瓜国产-美女张开腿让男人桶爽无弹窗-国产又粗又长的视频

Welcome to Shanwei Yiqiang Technology Engineering Co., Ltd.
Language 中文 English
Dust-free workshopCurrent location: Home > Dust-free workshop > Dust-free workshop

The purification workshop project is widely used in food workshops, electronic workshops and other places where purification needs are required to ensure the environmental quality of the workshop; the construction process of the purification project is to communicate with customers in the early stage, see the scene, and make preliminary investigations according to the previous stage. After the plan is confirmed, the contract is signed and construction is carried out, and the final debugging, acceptance and maintenance can be completed.

1. Construction process of clean project

1. Communicate and see the scene

Before a project is carried out, it is necessary to fully communicate with the customer and conduct on-site inspections, and to know what the other party wants, in order to determine a reasonable plan.

2. Design

The clean engineering company needs to make a preliminary design plan to the customer based on the previous communication and on-site inspection, and adjust it according to the customer's requirements.

3. Program exchange

The formation of a plan often takes many exchanges, and the final plan can only be determined after the customer is satisfied.

4. Sign the contract

This is a business negotiation process. Because now any project still needs a contract before construction, and only acting in accordance with the contract can ensure the rights and interests of both parties. This contract must specify the clean construction process and the cost of the project.

5. Design and construction drawings

After the contract is signed, the construction drawing will be produced. This step is very important, because the subsequent cleaning project is carried out in strict accordance with this drawing. Of course, the construction drawings must conform to the plan negotiated before.

6. Construction

At this stage, the construction can be carried out in strict accordance with the construction drawings.

7. Debugging detection

After the completion of the project, it is necessary to carry out debugging according to the requirements of the contract and the acceptance specifications, and to check whether the various processes meet the standards.

8. Acceptance

If the test is correct, the next step is acceptance, and it can be put into formal use after the acceptance is completed.

9. Maintenance

This is regarded as after-sales service. The construction party can't think that it can be completely ignored after the completion of the work. It still needs to take some responsibilities and do some post-service services for the warranty of this clean workshop.

About Us
Company Profile
Development path
Certifications
Cases
Creative fashion
Modern minimalist
LOFTI industry
Modern chinese
Decoration style design
Creative fashion
Modern minimalist
LOFTI industry
Modern chinese
Dust-free design
Application
Contact us
Contact Us
Feedback
  • Address: Yiqiang Technology Engineering Co., Ltd. in the middle section of Industrial Avenue, Shanwei City
  • Tel: 0660-3395388
  • Mob: 134-1105-2288
  • Contact: Miss Xu
  • E-mail: yiqiang_gs@163.com
Follow the applet
Follow the website
Online service
Scan it
铜梁县| 卓资县| 蒙城县| 隆德县| 古浪县| 延长县| 太仓市| 海安县| 连平县| 涟源市| 叙永县| 原阳县| 桐乡市| 阳高县| 天等县| 依兰县| 天全县| 黄大仙区| 盐边县| 藁城市| 逊克县| 上蔡县| 犍为县| 辛集市| 夏邑县| 潍坊市| 湖口县| 石楼县| 芷江| 许昌县| 宜宾县| 涡阳县| 衡水市| 宜章县| 收藏| 长海县| 邯郸县| 华安县| 泉州市| 乳山市| 祥云县|